News

xi-xsmall

MARCH 2009

The Extreme Cold Power System range has been increased with 100 watt and 150 watt models joining our existing range of 5 watt and 15 watt systems.

xi-xsmall

FEB 2009

We are pleased to announce the signing of a further collaboration agreement with The British Antarctic Survey and NERC. Following successful field trials we will be offering an ice core drilling unit for collecting ice cores and a specialist tool for snow sampling. Details to follow.

xi-xsmall

SEPT 2007

Xi announced the launch of the 'Extreme Cold Power System'.

xi-xsmall

JUNE 2007

In June 2007, Xi announced the launch of the 'Low Power Magnetometer'.

xi-xsmall

JAN 2004

In January 2004, NERC set-up collaboration with Newton Technology Group to manufacture Xi products.

xi-xsmall

JAN 2001

In January 2001, British Antarctic survey install the first Xi power generator in the Antarctic.

Scroll to Top